Skip to content
  • Facebook
  • Twitter
  • Instagram
  • Email
NEWSX 360 : The Global News Platform

NEWSX 360 : The Global News Platform

News from across the Globe

  • Home
  • About Us
  • Terms & Conditions
  • Contact Us
  • Editor’s Note
  • Privacy Policy
  • Toggle search form
  • Co-founder Shuvro Ghoshal Steps Down From The Bridge After Six Years News
  • Indian Companies Face US Heat, Sanctioned For Importing Petrochemicals From Iran India
  • TEAM India creates history at the Kudo Japanese MMA world cup Tokyo 2023 News
  • Assam: Guwahati advocate files FIR against BJP MLA Rupjyoti Kurmi for objectionable & derogatory statement on Taj Mahal News
  • Award-Winning, Burmese Restaurant & Tea Room – Burma Burma opens at Palladium, Ahmedabad News
  • Okayti Tea Estate inaugurates two stores to offer the Fresh Organic Darjeeling Teas News
  • Empowering Women and Youth in India: Keo Green Energy’s New Initiative News
  • IG Drones Wins the Excellence Award for best Disaster Management for Sikkim Flood Response News

Mumbai-Ahmedabad Bullet Train Project: NHSRCL Installs Over 2 Lakh Noise Barriers, Completes 243 Km Viaduct Construction

Posted on December 23, 2024 By No Comments on Mumbai-Ahmedabad Bullet Train Project: NHSRCL Installs Over 2 Lakh Noise Barriers, Completes 243 Km Viaduct Construction

Mumbai: The Mumbai-Ahmedabad Bullet Train Project has achieved a significant milestone with the installation of 206,000 noise barriers along both sides of the 103 km. According to National High Speed Rail Corporation, for every 1 km stretch, 2,000 noise barriers have been strategically placed on each side of the viaduct.

“The noise barriers are designed to mitigate sound generated by the train and civil structures during operations. These barriers reflect and distribute aerodynamic noise produced by the train as well as the sound generated by the wheels running along the tracks. Each barrier measures 2 metres in height and 1 metre in width, with a weight of approximately 830-840 kg. In residential and urban areas, taller noise barriers of 3 metres have been installed. These include an additional 1- metre translucent polycarbonate panel above the 2- metre concrete barrier to ensure passengers enjoy unobstructed views” said an official of National High Speed Rail Corporation (NHSRCL).

“To support the production of these barriers, six dedicated factories have been established. Three factories are located in Ahmedabad, with one each in Surat, Vadodara, and Anand” he said.

The Mumbai-Ahmedabad Bullet Train Project has also made significant progress in key construction works. Over 243 km of viaduct construction has been completed, along with 352 km of pier work and 362 km of pier foundation work. Bridges have been constructed across 13 rivers, and multiple railway lines and highways have been crossed through five steel bridges and two PSC bridges.

“Track construction in Gujarat is progressing rapidly, with RC (Reinforced Concrete) Track Bed construction underway in Anand, Vadodara, Surat, and Navsari districts. 71 track km of RC track bed construction has been completed, and welding of rails has commenced on the viaduct” said an official.

In Maharashtra, the first concrete base-slab for the Mumbai Bullet Train Station has been successfully cast at a depth of 32 metres, equivalent to a 10-storey building. Work on the 21 km tunnel between Bandra-Kurla Complex (BKC) and Shilphata is underway, with an Intermediate Tunnel (ADIT) of 394 metres completed to facilitate main tunnel construction.

According to NHSRCL, construction of seven mountain tunnels using the New Austrian Tunnelling Method (NATM) is progressing in Palghar district. The only mountain tunnel in Gujarat has already been successfully completed.

The 12 stations along the corridor, designed with thematic elements and energy-efficient features, are under rapid construction. These user-friendly and energy-positive stations are designed to provide a world-class passenger experience while prioritizing sustainability.

“The Mumbai-Ahmedabad Bullet Train Project is not only transforming connectivity but also creating significant social and economic benefits, including the generation of thousands of jobs, the development of local industries, and improvements in regional infrastructure. It will also help in reducing travel time, enhancing mobility, and fostering regional development, the project is set to drive economic growth and elevate the quality of life across Gujarat and Maharashtra.”- Vivek Kumar Gupta, Managing Director, NHSRCL

“The noise barriers are designed to mitigate sound generated by the train and civil structures during operations. These barriers reflect and distribute aerodynamic noise produced by the train as well as the sound generated by the wheels running along the tracks. Each barrier measures 2 metres in height and 1 metre in width, with a weight of approximately 830-840 kg. In residential and urban areas, taller noise barriers of 3 metres have been installed. These include an additional 1- metre translucent polycarbonate panel above the 2- metre concrete barrier to ensure passengers enjoy unobstructed views” said an official of National High Speed Rail Corporation (NHSRCL).

“To support the production of these barriers, six dedicated factories have been established. Three factories are located in Ahmedabad, with one each in Surat, Vadodara, and Anand” he said.

The Mumbai-Ahmedabad Bullet Train Project has also made significant progress in key construction works. Over 243 km of viaduct construction has been completed, along with 352 km of pier work and 362 km of pier foundation work. Bridges have been constructed across 13 rivers, and multiple railway lines and highways have been crossed through five steel bridges and two PSC bridges.

“Track construction in Gujarat is progressing rapidly, with RC (Reinforced Concrete) Track Bed construction underway in Anand, Vadodara, Surat, and Navsari districts. 71 track km of RC track bed construction has been completed, and welding of rails has commenced on the viaduct” said an official.

In Maharashtra, the first concrete base-slab for the Mumbai Bullet Train Station has been successfully cast at a depth of 32 metres, equivalent to a 10-storey building. Work on the 21 km tunnel between Bandra-Kurla Complex (BKC) and Shilphata is underway, with an Intermediate Tunnel (ADIT) of 394 metres completed to facilitate main tunnel construction.

According to NHSRCL, construction of seven mountain tunnels using the New Austrian Tunnelling Method (NATM) is progressing in Palghar district. The only mountain tunnel in Gujarat has already been successfully completed.

The 12 stations along the corridor, designed with thematic elements and energy-efficient features, are under rapid construction. These user-friendly and energy-positive stations are designed to provide a world-class passenger experience while prioritizing sustainability.

“The Mumbai-Ahmedabad Bullet Train Project is not only transforming connectivity but also creating significant social and economic benefits, including the generation of thousands of jobs, the development of local industries, and improvements in regional infrastructure. It will also help in reducing travel time, enhancing mobility, and fostering regional development, the project is set to drive economic growth and elevate the quality of life across Gujarat and Maharashtra.”- Vivek Kumar Gupta, Managing Director, NHSRCL

Related

India, News

Post navigation

Previous Post: ‘Don’t Cry Because It’s Over’: Ravichandran Ashwin Reflects India Career With Instagram post
Next Post: Thane: 45-Year-Old Man Gives Triple Talaq To Second Wife In Kalyan; Booked Under Muslim Women Protection Act

Related Posts

  • LawSikho wins the Best Legal EdTech Company of the year award  News
  • Vande Bharat 2.0 from Mumbai Central to GandhiNagar Capital becomes instant favorite. News
  • Dadasaheb Phalke International Film Festival Shines Bright with Sushim Rahul Gaikwad’s & Paras Jayesh Shah Triumph and Bollywood’s Finest News
  • Assam: AASU protest in Dibrugarh over skyrocketing price News
  • Uttarakhand Unveils Heli Tours to Adi Kailash and Om Parvat News
  • A faster and simpler platform enabling you to take better advantage of trading opportunities News

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Art of Living
  • Arts
  • Auto & Transportation
  • Automobile
  • Aviation
  • Banking
  • BCA ELECTIONS 2026
  • Bollywood
  • Brands
  • Business
  • Business Technology
  • Commodities
  • Economy
  • Education
  • Energy
  • Entertain­ment & Media
  • Entertainment
  • Entrepreneurs
  • Environment
  • Financial Services & Investing
  • Fitness
  • Gadgets
  • Health
  • Housing & Infrastructure
  • India
  • Information Technology
  • International
  • International Education
  • Investment
  • Lifestyle
  • Narendra Modi
  • News
  • People & Culture
  • Pharma
  • Policy & Public Interest
  • Politics
  • Sports
  • Stock Market
  • Tamilnadu
  • Technology
  • Telecom
  • The Multitaskers: A Series On Entrepreneurship with difference.
  • Travel
  • Uncategorized
  • UNICEF
  • Wellness
  • World News

Recent Posts

  • RoYALS Garba Faces Outrage from Barodians: High Fees, No Parking — Visitors Clash with Security, Horns Blare in Protest as Gates Shut After 10 PM
  • Opposition to ring the Election Commission tomorrow: Congress maps a street-to-Parliament campaign through October and November
  • Cockroach Party to CEC: Quit in 48 Hours — or We Take the Fight Nationwide Over 13 Crore Deleted Voters
  • A Temple of Health and a ₹1-Lakh-Crore Bet: Bengal CM, Gautam Adani Break Ground on 2,000-Bed Arogya Mandir
  • Baroda’s Moliya Captains Rest of India U-23 for CK Nayudu Trophy Clash in Chennai

Recent Comments

No comments to show.

Archives

  • October 2026
  • September 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • October 2021
  • September 2021

  • When VITIB Meets India’s Tech Investors: A Roadshow for Innovation and Growth Brands
  • Indian AI startup Blinkit-AI Secures USD 1.2 Million in Funding to Scale Unified AI Services in India Brands
  • VIBGYOR High Students Achieve Top Scores in ICSE 10th Board Examinations Brands
  • Understanding Round 1 MBA Deadlines at Top Global Schools: An International Student’s Perspective Brands
  • Rankers – Vikas Phadnis to Direct a Hard-Hitting Web Series on the Journey of NEET Aspirants Brands
  • Connplex Cinemas Limited IPO Opens on August 07, 2025 Brands
  • Rising demand for thread lifts sees APTOS rise in popularity, says Sakhiya Skin Clinic Brands
  • RIT Inaugurated One of India’s First Quantum Research Center, Chennai Brands

Powered by PressBook News WordPress theme