Highlights: Located in South Texas, Burke Hollow’s initial Production Area Authorization 1 (“PAA-1”) is the newest and largest In-Situ Recovery (“ISR”) wellfield being developed in the United States. Completing installation of the 106 monitor wells for PAA-1 marks a significant milestone…
Related Posts
GSE Systems Reports Second Quarter 2022 Financial Results
Conference Call Scheduled for today, August 15, 2022 at 4:30pm ET COLUMBIA, Md., Aug. 15, 2022 /PRNewswire/ — GSE Systems,…
E Source and DEFG’s Equity in a Clean Energy Economy Collaborative to host public workshop to address an equitable energy future
BOULDER, Colo., July 28, 2022 /PRNewswire/ — Registration is open for the Working Together for an Equitable Energy Future Virtual…
ENCORE ENERGY Q2/2022 URANIUM DRILLING UPDATE; NEW TREND DISCOVERY AT ROSITA PROJECT, TEXAS
TSX.V: EU OTCQB:ENCUF www.encoreuranium.com CORPUS CHRISTI, Texas, Aug. 2, 2022 /CNW/ – enCore Energy Corp. (“enCore” or the “Company”) (TSXV:…